The cheapest quote and the cheapest job are rarely the same thing, and the gap is usually the part that was left out.

One circuit check a month

Monthly

One thing a month worth measuring, testing or recalculating on a home electrical system β€” the part of sizing that happens after the install. No product pitches, and nothing that needs a live panel.

Free, no account. One click unsubscribes and deletes your address.

Free to use β€” Pro is for keeping it

This tool, like every other one here, is free and needs no account. A free account keeps three setups and three email alerts. Pro takes the ads off every site we run and lifts that to 200 setups and 50 alerts, adds a public page for any result and lets you embed the tool without our badge.

See what Pro adds Sign in

Try also

How this works

Put each quote in its own row and fill in the four lines rather than the headline figure. The permit and the making good are where quotes differ most, because they are the two items easiest to leave out and hardest to argue about afterwards. A quote that includes a permit, a load calculation and patching is not competing with one that is a bare circuit, even at the same total.

What a quote has to tell you

The four lines that make two electrical quotes comparable, and what a missing one usually means.

LineWhy it mattersIf it is missing
Conductor size and typeDecides whether the circuit is legal and lastingAsk β€” nothing else can be judged without it
Breaker rating and typeGFCI and AFCI cost real moneyExpect the cheapest device that passes
Permit and inspectionOften excluded, always neededIt becomes your problem later
Making goodDrywall, paint, trenchingThe largest change order on most jobs

A quote without the conductor size and the breaker rating cannot be compared with anything. Ask for both before you compare prices.

Frequently asked questions

Should the cheapest quote win?

Only once it is complete. Add the permit, the inspection and the making good to each one and the ranking changes on most jobs. A quote that omitted all three was never the cheapest; it was the shortest.

What should I ask that is not about price?

The conductor size and type, the breaker rating and type, whether the permit is included, and who is licensed to sign it off. The first two also let you check the work against the calculators on this site, which is the only independent check a homeowner has.

Is a load calculation worth paying for?

On anything that adds a large circuit β€” a charger, a heat pump, a range β€” yes, and it is often required for the permit anyway. It is the difference between finding out now that the service is at its limit and finding out after the equipment is on the wall.

How we calculate this

Each row is materials + labour + permit + making good. No discounting or contingency is applied: the aim is a like-for-like comparison of quotes as written, and adding an allowance would change which quote wins without adding information. Where a quote genuinely excludes an item, entering zero and noting it is more useful than estimating it, because the comparison then shows the gap rather than hiding it.